Trail Description Update
- Date Posted
- Jun 6, 2018
- Section
- Medina
- Chapter
- Lake Plains Chapter
The Medina Section Map dated January 2017 requires a very slight modification because Cleveland Metroparks has built an All Purpose Trail essentially where a Bridle Path was located in the past. The trail distance has not been changed significantly. The changes are being made to the text written as part of Points 28 and 29.
CW 53.2 E | CCW 2.6 S | Point 28 | Barr Rd at CMP All Purpose Trail (APT) along Valley Parkway
Near intersection, go E on paved APT that more or less parallels the S side of Valley Parkway within Brecksville Reservation, a unit of CMP, above I-77 (no access) and Highland Drive (0.7 mi).
CW 54.7 E | CCW 1.1 W | Point 29 | Bridle Path at Brecksville Rd (SR 21)
Continue E on paved APT past a small parking area (300’). Return to the text as written in your Medina Section map.