Skip to main content

Canal Towpath Trail Upgrades

Date Posted
Sep 16, 2025
Section
St. Marys

This trail alert applies to all BTA map products. It affects the Buckeye Trail (BT) from Points 26-27 in the St Marys Section.

Work begins on the Miami Erie Canal Towpath Trail on 9-15-2025 and will last approximately 6 months. The work includes raising the level of the towpath and replacing the Vail Pond spillway. As a result, the towpath from US 33 to Pt 27 at Glynwood Rd will close 7am - 5pm daily for workweek days, but will be open weekends.

The detour for the route begins at Pt 26, Lock 13 Parking w/Shelter House in St Marys:

At High St, turn R (slightly NE).
At Spruce St (SR 66), turn left (N).
Eventually pass a small shopping center and cross over US 33.
At CR66-A, turn L (N).
Reaching Glynwood Rd (T-160), turn L (W).
Pt. 27. Towpath at Glynwood Rd (T160), Continue on the BT as described in your BTA map product.

© Buckeye Trail Association